SR |
PROJECT NAME |
CLIENT |
CONTRACTOR |
TYPE OF WORK |
Diameter Range |
1 |
Al-Khobar Desalination Plant Phase-III |
Saline Water Conversion Corporation (S.W.C.C) |
Hitachi Zosen Corporation (Japan) |
Supply of FRP pipes/spools site connections, supervision and inspection. (Adhesive, But Strapp) |
25 - 2300 mm |
2 |
Al-Khobar Power Plant Phase-III |
Saline Water Conversion Corporation (S.W.C.C) |
Mitsui Engineering & Ship Building |
FRP pipes/spools site connections, supervision and inspection. (Adhesive, But Strapp) |
25 - 1300 mm |
3 |
Shoaiba Power Plant Phase-2 Lot 1A |
Saline Water Conversion Corporation (S.W.C.C) |
Consolidated Contracting Company |
Butt Strap Site Connections |
800 - 1500 mm 100 - 800 mm |
4 |
Shoaiba Desalination Plant Phase-2 Lot 1B |
Saline Water Conversion Corporation (S.W.C.C) |
TAMIMI (Hanjung) |
Adhesive and Butt Strap site connections for pipes and fittings. |
25 - 1500 mm |
5 |
Sadaf Expansion (Civil)(SADAF) |
Saudi Petrochemical Co. |
H.K. AL-SADIQ, Brown & Root Saudi |
Butt Strap Site connections |
600 - 1560 mm 150 - 900 mm |
6 |
Sadaf Expansion (Mechanical) |
Saudi Petrochemical Co. |
Mohd. Al-Mojil |
Butt Strap Site Connections |
50 - 1200 mm |
7 |
Chlorine Header Replacement |
Saudi Petrochemical Co. |
Saudi Petrochemical Co., (SADAF) |
Butt Strap Site Connections |
1300 - 1700 mm |
8 |
Saudi Arabian Fertilizer Company (SAFCO) |
IBN - BAYTAR |
Chiyoda Petrostar Limited (Japan) |
Replacement of Carbon steel pipes with FRP pipes, supply & erection of pipes and spools. |
50 - 200 mm |
9 |
Saudi European |
IBN - ZAHR |
Saudi European |
Repair & Maintenance |
100 - 1450 |
Petrochemical Co., |
|
Petrochemical Co., |
work for FRP piping |
mm |
|
|
|
systems |
|
10 |
SAFCO - 2 Expansion. |
TECNIMONT |
Consolidated |
Butt Strap Site |
50 -2300 mm |
|
|
Contracting Co., |
Connections |
|
|
(C.C.C) |
|
11 |
Ibn - Rushd PTA |
SABIC |
Consolidated |
Butt Strap Site |
50 - 2100 mm |
Aromatic, YANBU |
|
Contracting Co., |
Connections |
|
|
(C.C.C) |
|
12 |
Luberef - II Project, |
Saudi Aramco |
Al-Taqqaddum Est., |
FRP pipes/spools site |
25 - 800 MM |
Yanbu |
|
|
connections, supervision |
|
|
|
and inspection. |
|
|
|
(Adhesive, Butt Strap) |
13 |
Replacement of |
SCECO (East) |
SCECO (East) |
Supply & Erection of FRP |
25 - 300 mm |
Chlorination Plant, |
|
|
pipes / spools, site |
Piping of phase I and |
|
|
connections, Supervision |
Installation of gas Separators |
|
|
and Inspection |
14 |
Al-Sharq |
SABIC |
C.C.C. |
Butt Strap Site |
1000 - 2000 |
|
|
|
Connections |
mm |
15 |
Kemya Major |
SABIC |
Saudi Binladin Group |
Adhesive and Butt Strap |
25 - 2000 |
Expansion (ISBL) |
|
|
site connections for pipes/fittings |
mm |
16 |
Kemya Major |
SABIC |
Bellast Nedam Group |
Adhesive and Butt Strap |
25 - 1350 mm |
Expansion (ISBL) |
|
n.v. |
site connections for pipes |
|
|
|
and fittings. |
17 |
National Industrial |
SABIC |
Air Products U.K. |
Supply & Erection of FRP |
25 - 900 mm |
Gases Co. Expansion |
|
|
pipes / spools, site |
|
|
|
connection, Supervision |
|
|
|
and Inspection |
18 |
King Abdul Aziz Naval |
KANB |
KANB |
Supply & Erection of FRP |
25 - 750 mm |
Base |
|
|
pipes / spools, site |
|
|
|
connection, Supervision |
|
|
|
and Inspection |
19 |
Petrokemya Expansion |
SABIC |
Dywidag (Germany) |
Adhesive and Butt Strap |
25 - 2000 mm |
|
|
|
site connections for pipes |
|
|
|
and fittings. |
20 |
Ibn Zahr Expansion |
SABIC |
Saudi Binladin Group |
Adhesive and Butt Strap |
25 - 350 mm |
|
|
|
site connections for pipes |
|
|
|
and fittings. |
21 |
Shoaiba Power Plant |
SWCC |
Saudi Arabian Bechtel |
Adhesive and Butt Strap |
80 - 900 mm |
phase 2, lot 1 A |
|
Co. |
site connnections for pipes |
|
|
|
and fittings. |
22 |
Hawayiah Gas Plant |
ARAMCO |
Consolidated |
Butt Strap Site |
Up to 1400 |
|
|
Contractors Co. |
connections for pipes and |
mm |
|
|
|
fittings. |
|
23 |
Alkhobar - 2 and PS A1 |
SWCC |
TEKFEN Insaat VE |
Engineering, Supply & |
25 - 200 mm |
Aziziyah |
|
Tessisat A.S. |
Erection of FRP pipes / |
|
|
|
spools, Tanks, site connection, |
|
|
|
Supervision and Inspection |
24 |
Shoaiba Power Plant |
SCECO (Western |
GAMA AL- |
Supply & Erection of FRP |
25 - 800 mm |
Phase I, Lot-I |
Region) |
MOUSHEGAH |
pipes/spools, site, connection, |
|
|
|
Supervision and Inspection |
25 |
Amiantit Group of Co. |
Amiantit |
|
FRP Lining of Steel Tank |
|
Dammam, KSA |
|
|
(6M dia. Height=8 mtrs.) |
|
26 |
King Abdulaziz Air Base |
US Department of |
Al-Sari Contracting |
Supply & Erection of FRP |
200 - 600 mm |
Dhahran |
Defense |
Company |
pipes/spools, site, connection, |
|
|
|
Supervision and Inspection |
27 |
Haradh Gas Project |
Saudi Aramco |
Consolidated Contractors |
Butt Strap site |
1200 - 1600 |
|
|
Co., (CCC) |
connections for pipes and |
mm |
|
|
|
fittings. |
|
28 |
Haradh Gas Project |
Saudi Aramco |
Technip (Italy) |
Butt Strap site |
1600 mm |
|
|
|
connections for pipes and |
|
|
|
fittings. |
29 |
PetroKemya |
Petrokemya |
Gama Al Moushegay |
Butt Strap site |
200 - 1500 |
Polyethylene Project |
|
Arabia Limited |
connections for pipes and |
mm |
|
|
|
fittings. |
|
30 |
SWCC Blended water |
Saline Water |
Pipe Technology |
Supply and installation of FRP |
150 mm, 1 km |
pipe replacement |
Conversion Corporation |
System (PTS) |
pipes and fittings. |
|
|
(SWCC) Jubail |
|
|
|
31 |
Installation of Duplex |
SAMAD |
Pipe Technology |
Supply of FRP pipes and |
25 - 400 mm |
Strainer at SAMAD |
|
System (PTS) |
fittings and installation of |
|
|
|
Duplex Strainer |
32 |
FRP lining on Steel tank |
Arabian Oil Company |
Olayan Descon |
FRP Lining of Steel Tank |
Diameter 3.6 Mtr & |
|
(AOC) Khafji |
|
|
length 16.8 Meter |
33 |
Fujairah Power Plant, |
Ministry of Water & |
Amiantit Fiberglass |
Butt Strap site |
25 mm - 3700 |
Abu Dhabi |
Electricity |
Industries |
connections for pipes and |
mm |
|
|
|
fittings. |
|
34 |
Replacement of inlet |
Royal Commission |
Fahad Al Dakheel Co. |
Supply and installation of FRP |
Up to 700 mm |
pipes of PST at SWTP |
Jubail 1 |
|
pipes and fittings. |
diameter |
# 9, contract # 350 - 508 - SC - 26 |
|
|
|
|
35 |
Jubail Petrochemical |
Sabic |
Saudi Binladin Group |
FRP pipe system Site |
25 mm to |
Complex |
|
(PCM Division) |
Connection |
3500 mm |
36 |
NIC PDH Polypropelene |
National Industrialization |
Nassir Al Hajry Co. |
FRP pipe system Site |
25 mm to |
|
Co. |
|
connection |
2000 mm |
37 |
Uthmaniyah GOSP |
Saudi Aramco |
Technip / Tekfen |
FRP pipe system Site |
Up to 450 mm |
Project |
|
|
connection |
38 |
King Abdul Aziz Naval |
KANB |
KANB |
Supply & Erection of FRP pipes |
25 - 750 mm |
Base Phase 11 |
|
|
spools, site connection, |
|
|
|
Supervision and inspection |
39 |
SWCC Al Khobar |
Saline Water Conversion |
Pipe Technology |
Supply and installation of FRP |
80 mm |
Chloronation |
Corporation (SWCC) |
System (PTS) |
pipes and fittings. |
replacement |
Al Khobar |
|
|
40 |
SWCC Jubail |
Saline Water Conversion |
Pipe Technology |
Supply and installation of FRP |
40 - 400 mm, 600 mtrs. |
replacement of Rubber |
Corporation (SWCC) |
System (PTS) |
pipes and fittings. |
lined pipes with Fiberglass |
Al Jubail |
|
|
41 |
SIPC-SMJ underground |
SIPC |
Global Line Cont. Co. |
FRP Pipe system Site |
200 - 1800 mm |
piping |
|
|
connection |
42 |
Royal Commission East |
Royal Commission |
Al-Ertifaa |
Supply, Fabrication & |
1400 mm |
Pumping Station Exp. |
Jubail |
|
installation of Pipes/Fittings |
43 |
SWCC / Yanbu |
Saline Water Conversion |
Belleli Saudi Heavy Ind. |
Butt Strap site Connection |
80 - 1200 mm |
Desalination & Power Plant |
Corporation (SWCC) |
|
for Pipes & Fittings |
44 |
SWCC/Shuquiq |
Saline Water Conversion |
Bondstrand |
Dismantling / Installation |
500 - 1000 mm |
Desalination & P P |
Corporation (SWCC) |
|
of Pipe Spools Adhesive |
45 |
NIGC |
SABIC |
SABIC |
Dismatling of 650 ND |
650 mm |
Jubail |
|
|
Steels, spools & replacement |
46 |
SAFCO - IV |
SABIC |
Raymonds Saudi |
Butt Strap site Connection |
150 - 1800 mm |
Expansion |
|
Arabia |
|
|
47 |
SOHAR REFINERY |
Oman Petrolium |
Consolidated Contracting |
Butt Strap site Connection |
450 - 2000 mm |
|
|
Company (CCC) |
|
|
48 |
Replacement of existing |
|
|
|
|
damage FRP Vent |
Saline Water Conversion |
Pipe Technology |
Supply and installation of FRP |
25-150 mm |
Pipes & Fittings from |
Corporation (SWCC) |
System (PTS) |
pipes and fittings. |
|
Ph-1 Desal # 1 to 6 |
Al-Jubail |
|
|
|
evaporator roofs with |
|
|
|
|
new FRP Pipes/fittings |
|
|
|
|
49 |
Al-Hasa/ Aindar Quad-I |
Saudi Aramco |
TEKFEN |
Erection of RTR Pipe & Fittings and |
100 - 300 mm |
P/L & support facilities |
|
|
Hydro testing |
Project |
|
|
Supervision and inspection |
50 |
DHT Complex Project |
Saudi Aramco |
TEKFEN |
(1). Erection of RTR Pipes & fittings |
25 - 400 mm |
Yanbu Refinery |
|
TRGS |
(2). FRP Coupling joints |
25 - 900 mm |
|
|
|
|
|
51 |
Qurayyah Sea Water |
Saudi Aramco |
National Contracting |
(1). Erection of RTR Pipes & Fittings |
25 - 900 mm |
Treatment Plant |
|
Co., Ltd. (NCC) |
(2). Erection of FRP Pipes & Fittings |
1350 - 1800 mm |
(QSTP) |
|
|
|
|
52 |
ALBA - BAHRAIN |
ALBA |
NCC - BAHRAIN |
1.Supply Erection of RTR |
50 - 150 mm |
PROJECT |
|
|
pipes and fittings |
|
|
|
|
2.Copper tubing, pipes & fittings |
25 - 50 mm |
53 |
SWCC - Jubail Plant |
SWCC |
Pipe Technology System |
Supply of FRP pipes & fittings |
1500 - 2100 mm |
74-6 MIGD PWTEP (Shutdown) |
Jubail |
installation of Pipes/Fittings |
54 |
SWCC-Jubail Plant |
SWCC |
EMCO |
FRP pipe system Site |
50 - 2100 mm |
74.6 MIGD PWTEP |
|
|
connection |
55 |
Sabiya Distillation Plant |
Ministry of Water and |
DOOSAN - Kuwait |
FRP Pipe System site Connections |
200 - 2000 mm |
with Recarbonation |
Electricity - Kuwait |
|
(2). Coupling Joints including |
200 - 2000 mm |
system - Kuwait |
|
|
Hydrotesting |
|
56 |
Dolphin Project, QATAR |
Qatar Gas |
Nasser Al-Hajri |
FRP Pipe System site Connections |
50 - 1800 mm |
57 |
Sohar Power & Desalination |
MEP |
Doosan |
Erection of FRP Pipes and fittings |
150 - 2900mm |
Project |
|
|
|
|
58 |
SWCC - Jubail Plant |
SWCC |
PTS |
Supply and erection of FRP pipes |
150 - 450 mm |
Service Water Lines |
|
|
and Fittings |
|
59 |
Sharq 3rd Expansion (Foster Wheeler) |
SABIC |
Amiantit Fibergalss Industries Limited |
Butt Strap Site Connections |
80-4000 mm |
60 |
Sharq 3rd Expansion (Stone & Webster) |
SABIC |
Nasar Al Hajri |
Butt Strap Site Connections |
80-4000 mm |
61 |
YANSAB - Yanbu |
Saudi Binladen Group |
Saudi Binladen Group |
FRP Pipe System site Connections |
600-4000mm |
62 |
Rabigh Olefin Plants Project |
Aramco |
Consolidated Contracting Co. |
Butt & Wrap Joints and Adhesive Joints |
1100-2700mm |
50-1000mm |
63 |
Hadeed |
SABIC |
National Contracting Company |
Butt & Wrap Joints and Adhesive Joints |
25-1800mm |
64 |
Tasnee Ethylene Project, Jubail |
SABIC |
Nasar Al Hajry Corp. |
Butt and Wrap Joints |
1700-3800mm |
65 |
Tasnee Ethylene Project, Jubail |
SABIC |
Raymonds Saudi Arabia Ltd |
Butt and Wrap Joints |
80-3400mm |
66 |
OL2K Ethylene Project, Kuwait |
Kuwait Petrochemicals |
Consolidated Contracting Co. |
RTR Adhesive Joitns site connection |
400-1350mm |
67 |
Khursaniyah Gas Plant |
ARAMCO |
Consolidated Contracting Co. |
Butt and Wrap Joints |
1000-1500mm |
68 |
Infrastructure in Zone 'A' for Stage 1 |
Royal Commission |
Al Harbi Trading & Cont. Co. |
FRP butt & wrap joints |
4000mm |
69 |
SIPCHEM |
SABIC |
Raymonds Saudi Arabia Ltd |
FRP/RTR Butt & Wrap Joints |
250-2000mm |
70 |
Al Bayroni |
SABIC |
Al Jubail Fertilizer Co. |
FRP Lining on Steel Tank |
1.3 x 1.5 mts |
71 |
SAMREF |
Flour Arabia |
Abdul Aziz Ali Al Turki & Partners Co. |
GRP Pipes and fittings site connection |
40mm to 2850mm |
72 |
Rabigh Development Project-Refinery |
ARAMCO |
Technicas Reunidas |
Adhesive & Butt &Wrap Joints |
450mm to 1400mm |
73 |
NATPET PP Plant, Yanbu |
YANSAB |
GAMA Al Mushegah Arabia Ltd. |
GRP Pipes Lamination Work |
500mm |
74 |
Ibn Zahr PP III - Jubail |
Samsung Engg. Co., Ltd. |
Nasser Al Hajri Corp. |
RTR Adhesive Butt & wrap Joints |
75mm to 500mm |
75 |
Rabigh SWRO Plant |
Rabigh RO Plant |
Huta Marine Company |
Spool installation for sand filter |
100mm to 700mm |
76 |
Marafic Jubail |
Power and water utility Co., Jubail |
Termomeccanica Saudi Co. Ltd. |
FRP Site Connection, 6" Nozzle repair & Replace |
450 mm & 1400mm |
77 |
Ar Razi Plant Methanol Project - Jubail |
Saudi Methanol Company |
Nasser S. Al Hajri Corp. |
FRP/RTR Butt & Wrap Joints |
50mm to 1800mm |
78 |
Quraiyah Sea water Treatment Plant |
ARAMCO |
National Contracting Company |
FRP/RTR Piping works |
25mm to 1800mm |
79 |
Shuaibah IWPP PH III |
Doosan Heavy Industries |
Amiantit Fibergalss Industries Limited |
Installation of FRP Pipes/Fittings |
50mm to 2600mm |
80 |
Evaporation Pond, Aindar |
SNC Lavalin - Saipem |
Mofarreh Al Harbi Est., |
FRP/RTR Butt & Wrap, Adhesive Joints |
150mm to 1200mm |
81 |
NIGC Phase VII, Jubail |
SABIC |
Nasser S. Al Hajri Corp. |
FRP/RTR Butt & Wrap, Adhesive Joints |
40mm to 1000mm |
82 |
ASU (Gas Phase 3), Yanbu |
Linde |
Nasser S. Al Hajri Corp. |
FRP/RTR Butt & Wrap, Adhesive Joints |
25mm to 2100mm |
83 |
Sipchem Co-Plant, Jubail |
Sipchem |
Nasser S. Al Hajri Corp. |
Key Lock and Taper Adhesive Joints |
150mm to 200mm |
84 |
Cooling Tower, Jubail |
SABIC |
Cooling Technologies, Germany |
FRP/RTR Butt & Wrap Joints |
1200mm |
85 |
Safaniya,Jubail |
ARAMCO |
National Contracting Company |
FRP/RTR Adhesive Joints |
75mm to 350mm |
86 |
SAFCO Plant, Jubail |
SAFCO |
Uhde Arabia Ltd. |
FRP/RTR Butt & Wrap Lamination |
50mm |
87 |
New Chiller, NAPCO, Dammam |
NAPCO Modern Plastic Products Co., Dammam |
NAPCO |
Supply and lamination of Flange |
200mm |
88 |
Modification of 72" dia seawater return line SPC-Jubail (Tasnee) |
SPC Tasnee |
Al Suwaidi Industrial Services Company |
FRP/RTR Butt & Wrap Lamination |
1350mm |
89 |
Infrastructure Return Bypass (065-C42), Jubail |
Royal Commission |
ABDULLAH a.m. Al-Khobdari Sons Co. |
FRP/RTR Butt & Wrap Lamination |
200mm to 800mm |
90 |
P&C Infrastructure, Jubail |
SABIC |
Saudi Binladen Group |
FRP/RTR Butt & Wrap Lamination |
150mm to 1300mm |
91 |
Rabigh development - utilities & offsites umbrella cpnstruction works |
ARAMCO |
Tekfen Insaat Ve Tesisat A.S. |
FRP/RTR Butt & Wrap Lamination and Key lock joints. |
75mm to 2000mm |
92 |
Power & water utility Co. (Marafiq IWPP) |
Hyundai Heavy Industries |
Najran Co. for Trading & Contracting |
Butt & Wrap Lamiantion, Coupling and Key lock joints |
100mm to 3500mm |
93 |
Shaybah Power Generation Plant |
ARAMCO |
National Contracting Company Ltd. |
FRP/RTR Butt & Wrap, Adhesive Joints |
25mm to 1200mm |
94 |
Foster Wheeler/Sharq 3rd Expansion |
SABIC |
Bilfal Heavy Industries Ltd. |
FRP/RTR Butt & Wrap Lamination |
150mm |
95 |
Hadeed Expansion Project, Jubail |
Hadeed |
Saudi Voest Alpine |
FRP/RTR Butt & Wrap Lamination |
1800mm |
96 |
Samsung Tasnee, Jubail |
Sharq |
Al Naba Contracting Enterprices |
FRP/RTR Butt & Wrap, Adhesive Joints |
25mm to 800mm |
97 |
Sharq - Foster Wheeler, Jubail |
Sharq |
Saudi Binladen Group – PC&M Division |
FRP/RTR Butt & Wrap Lamination |
750mm |
98 |
SWCC Shutdown, Jubail |
SWCC |
Faisal Electro Mechanical Co., Ltd. |
FRP/RTR Butt & Wrap Lamination |
2700mm |
99 |
Water Injection Pumps Stations (WIPS) |
ARAMCO |
Mohammed Al Mojil Group |
FRP/RTR Butt & Wrap, Adhesive Joints |
50mm to 1200mm |
100 |
YANSAB HDPE & BBTX Project, Yanbu |
YANSAB |
Al Suwaidi Industrial Services Company |
FRP/RTR Butt & Wrap, Adhesive and Key lock Joints Joints |
100 mm to 1400mm |
101 |
ISBL civil Works Contract CC1 at Ras Az Zawr |
Ma'aden |
Ahmed N. Al Bin Ali & Contracting Company |
FRP Butt & Wrap and Coupling Joints |
1300mm to 2700mm |
102 |
Yansab - Yanbu |
YANSAB |
Kwadder Al Watan Group |
Taper Adhesive Joints |
200mm to 800mm |
103 |
Al Waha Project, Jubail |
Technimont |
Abdullah A.M. Al-Khodari Sons Co. |
FRP Butt & Wrap Joints |
80mm to 150mm |
104 |
Saudi Kayan Effluent Treatment Plant, Jubail |
Saudi Kayan Petrochemical Company |
Al Suwaidi Industrial Services Company |
FRP Butt & Wrap Joints |
80mm to 2000mm |
105 |
MED Pilot Plant, Jubail |
SWCC |
Arabian Company and Sasakura for Water and Power |
Supply of FRP materials and FRP Butt & Wrap Joints |
40mm to 150mm |
106 |
Al Waha Project, Jubail |
|
Mishnan Corporation for Contracting |
FRP Butt & Wrap Joints |
800mm |
107 |
Al Waha PDH PP Plant |
SABIC |
Daelim Saudi Arabia Co., Ltd. |
FRP Butt & Wrap Joints |
12mm to 200mm |
108 |
Samsung Tasnee, Jubail |
Samsung Engg. Co., Ltd. |
Al Naba Contracting Enterprices |
FRP Butt & Wrap Joints |
700mm |
109 |
Shuaibah RO Plant |
Doosan Heavy Industries |
Amiantit Group of Co. |
FRP Butt & Wrap Joints |
20mm to 1800mm |
110 |
Ibn Zahr PP III U&O - Jubail |
SABIC |
Daelim Saudi Arabia Co., Ltd. |
RTR Butt & Wrap Joints |
25mm to 800mm |
111 |
Sipchem JAC, Jubail |
Flour Daniel Co. |
Nasser S. Al Hajri Corp. |
FRP Butt & Wrap and Adhesive Joints |
50mm to 2300mm |
112 |
Methanol, Jubail |
|
Nasser S. Al Hajri Corp. |
RTR Butt & Wrap Joints |
500mm to 1100mm |
113 |
Saudi Kayan Olefin, Jubail |
Saudi Kayan Petrochemical Company |
Nasser S. Al Hajri Corp. |
Adheseive and Keylock Joints |
100mm to 750mm |
114 |
Saudi Kayan, Jubail |
Saudi Kayan Petrochemical Company |
Saudi Binladen Group |
FRP Butt & Wrap Joints |
20mm to 4000mm |